Guidelines for evaluated products
5 controls in 2 sections in this part of the Information Security Manual (ISM). Each control links to plain-English guidance, audit tips and cross-framework mappings.
5 controls
No controls on this page match.
Evaluated product procurement
3 controls- ISM-0280Choose PP-evaluated products over EAL-based onesWhen buying an evaluated product, prefer one with a completed PP-based evaluation, covering all applicable PP modules and any applicable software bill of materials assessment, over an EAL-based one.NCOSPSTS
- ISM-0285Ensuring evaluated products follow delivery proceduresEvaluated products must be delivered consistently with any delivery procedures in their evaluation documentation, so those documents have to be read before delivery.NCOSPSTS
- ISM-0286Consult ASD for high assurance IT delivery proceduresWhen buying high assurance IT equipment, contact ASD for any delivery procedures specific to that equipment.STS
Evaluated product usage
2 controls- ISM-0289Implement and manage evaluated products correctlyEvaluated products must stay in an evaluated configuration and follow vendor guidance at every stage: installation, configuration, administration and daily operation.NCOSPSTS
- ISM-0290Secure configuration of high assurance IT equipmentHigh assurance IT equipment must stay in an evaluated configuration and follow ASD guidance at every stage: installation, configuration, administration and daily operation.STS
Back to the full ACSC ISM control list, or browse the complete control library.




